BWTS ENGINEERING RETROFIT INTRODUCTION
HANG Marine engineering project team consist of 39 engineers, among them 35 engineer have seaman's book, including 4 foreman, 6 electrician, 12 fitter, 17 welders, all of them have strong experience both technically and operationally having previously worked in shipyard or sailed with vessel , our team can operate 8-10 vessels at the same time , in DD, voyage or sail with vessel ,therefore we can provide high quality ,timely and agile service to clients. The following is performance chart and introduction of BWTS retrofit project:
1、3D Scan And Design
2、Valve, Filter, Cable Supply
3、Pipe Prefabrication, Galvanized And Logistics
4、Equipment,Filter,Control Box And Accessorial Located